Draw section of excavation .
 
  Program name : EARTH.LSP

Draw an figure when you calculate the amount of excavation. It draw only a figure. Please refer to the following for various default values ??and usage.

  ¡ß Notice »çÇ× ¹× default ¢¹ It is suitable only original ground surface is level. ¢¹ Slop of soil is 1:1, weathered rock 1:0.4, soft rock 1:0.3 ¢¹ distance between slop to structure is 0.5m ¢¹ This program draw figure two case that excavation depth is over 4m and under 4m

  Example Insert (MID)point:{p1} [Pick center point of footing] B(m): 6 [Width: Horizontal length] W(m): 8 [Depth: perpendicaular to screen] Height of TOSA(m): 2.5 [depth of Soid] Height of RIPPING(m): 1 [depth of weathered rock] Height of BALPA(m): 0.5 [depth of soft rock]